MIL-HDBK-1001/SA
14.3.12 Testing. Test waterproofing completely, specifically at flashings, expansion joints, and drains where most leaks occur, before additional components are added.
14.3.13 Overflow Drains. Refer to Section 8, par. 8.3.1.
14.3.14 Interior Gutters. Require interior metal gutters under expansion joints or skylight perimeters. Connect these gutters
to the building's interior drainage system.
14.4 Applicable Details. Refer to ASTM C 898, Guide for Use of High Solids Content, Cold Liquid-Applied Elastomeric Waterproofing Membrane With Separate Wearing Course, ASTM C 981, and the NRCA Roofing and Waterproofing Manual.
S6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business