MIL-HDBK-1003/1
SECTION 106
PERMITS
(DELETED IN ITS ENTIRETY)
SECTION 107
INSPECTIONS AND TESTING
107.1 Required Inspections and Testing. The code official, upon notification from the construction contractor or the construction contractor's agent, will make the
following inspections and such other inspections as necessary,
and will either release that portion of the construction or
will notify the construction contractor or an agent of any
violations that are to be corrected. The construction
contractor is responsible for the scheduling of such
inspections.
1. Underground inspection will be made after trenches or ditches are excavated and bedded, piping installed, and before any backfill is put in place.
2. Rough-in inspection will be made after the roof, framing, fireblocking, firestopping, draftstopping, and
bracing is in place and all piping and other components are complete, and prior to the installation of wall or ceiling membranes.
3. Final inspection will be made upon completion of the plumbing systems
The requirements of this section will not be considered to prohibit the operation of any plumbing equipment or appliances installed to replace existing equipment or appliances serving an occupied portion of a structure provided that a request for inspection of such plumbing equipment or appliances has been filed with the code official not more than
48 hours after such replacement work is completed, and before any portion of such equipment is concealed by any permanent portion of the structure.
107.1.1 Approved Agencies. The code official may accept reports of approved agencies, provided such agencies satisfy the requirements as to qualifications and reliability.