MIL-HDBK-1036A
e) Locate bachelor housing within walking distance of community facilities, such as dining facilities. Programmers should address the capacity of existing community facilities and accommodate any additional requirements incurred by the proposed bachelor housing increase.
f) Capacity of existing bachelor housing using assignment standards discussed below.
g) Physical security of personnel and property.
2.4 Existing Construction Modernization Standards. Net living area of a room is measured from the inside face of the peripheral wall and includes all such enclosed space and partitions.
2.5 Navy New Construction Standards. See Table 1. The criteria standards for new construction for bachelor enlisted and bachelor officers includes the following design configuration types:
a) (1+1) apartment module plans for permanent party
(Figures 1, 2, and 3).
b) (2+2). The Navy will use the (2+2) apartment type for transients (Figures 4, 5, and 6). Transients include:
(1) "A" school students, deployed rotational units, and ships crews in a commissioning, decommissioning, or overhaul status.
(2) Students attending school less than 20 weeks. (3) Reserves on active duty training (ACTDUTRA). (4) Temporary duty (TDY) personnel.
include:
c) Open bay (Figure 8) design configurations are to
(1) Recruits
(2) Special forces with special mission needs
(example: Navy seal teams and special forces).
d) The Navy occasionally houses in accordance with
OPNAVINST 11103.1, but does not build for:
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business